Brick Paver Installation & Edging



Staging of material

Many paver tasks will vary depending on access, site conditions, job size and of course, the weather. Careful factor to consider should be taken to identify the time to begin the paver installation.

The supervisor or job supervisor ought to always have the products (sand/ pavers) dispersed around the project website for efficient and easy installations. Paver pallets/bundles should be positioned in a way not to hinder the paver installation. The proper pallet/bundle placement can make the real project installation simpler and quicker by lowering the total labor of handling the material.

Brick paver patterns

Pavers can be positioned in various patterns depending on their shape. Each paver shape will usually have numerous different hatch patterns that are provided by the manufacturer.

The laying pattern and shape of the paver is very crucial to the efficiency of the application. Professionals need to consider the traffic weight loads on their paver tasks. 90 or 45 degree herringbone patterns are advised in all street and driveway applications, as these patterns will provide the optimum load support needed and will resist sneaking from the turning of tires and starting or braking of car traffic. In a lot of applications around the world, it has been revealed that pavers laid in a herringbone pattern have carried out effectively.

Pavers that are 60 mm (2 - 3/8 in) thickness appropriate for pedestrian applications. Pavers that are going to be used in commercial or industrial applications ought to be 80 mm (3 - 1/8 in) in thickness.

Reference/starting point for brick paver installation

There are a variety of conditions that identify the beginning point of a paver job.

When beginning to install pavers it is best to snap a real straight chalk line on the surface of the bed linen sand or pull a real straight string line above the surface of the bedding sand at the finished elevation of the pavers This will assist as a guide for maintaining straight joint lines and will also allow the installer to make changes in the alignment of the pavers.

Buildings and concrete curbing are normally not straight and should not be used for establishing straight joint lines. The use of string lines is necessary to figure out the real straightness of the edge. As the paver installation progresses, the string lines will help reduce the requirement for little trim pieces.

These will preserve a minimum joint width and allow the bed linen and jointing sand to get in between each paver. Pavers with spacer bars are typically not laid in snug against each other considering that a string line will supply consistent joint spacing.

Installation of brick pavers.

One of the most extensively used methods for the installation of pavers is hand installation of each paver. It is best to install a single row of pavers along one of the true straight lines that you have pulled or above the bedding sand. The best method is to place a paver against another one and let it slide down into the bed linen sand.

When setting up pavers on a high grade, they need to be set up at the base of the grade going uphill. This will avoid the pavers from sneaking as they are being laid.

On big commercial and industrial applications, hand laying pavers would not be cost effective due to the labor strength. The very best method for setting up pavers on large tasks is to install them mechanically. The use of a mechanical laying machine can install approximately 6000 - 7000 sq ft a day. There are a couple items a specialist need to think about prior to setting up pavers mechanically:

1.) Mechanical installers are only efficient in setting up pavers in specific patterns.

2.) The professional should make sure that the manufacturer can manufacturing and bundling pavers in the desired pattern on the pallets for simple mechanical installation.

3.) Specialists might experience a color mixing circumstance coming off the packages of pavers Poor color mixing could result in a patchy looking installation. The majority of makers follow color blending on each bundle of pavers, however it is the specialist's obligation to ensure proper mixing in the field.

Cutting procedures for brick pavers.

Professionals generally have two methods of cutting pavers. Pavers are cut either by 1). A double bladed guillotine or by 2). A gas powered cut off saw or brick saw which is geared up with a diamond blade. The diamond blade cut-off saw or brick saw will offer a much cleaner and more accurate cut. The majority of brick saws will have a tube accessory on them which will allow the operator to cut the pavers damp. When cutting pavers wet, it will assist lessen dust and will prolong the diamond blades life. The operator of the brick saw should constantly cut the pavers away from the surface of the paver field when cutting damp, due to the fact that the pavers will create a slurry that will stain the paver surface area. Pavers that are cut ought to not fit tight, sufficient spacing needs to be offered for jointing sand.

The brick saw operator must always use the correct security that is needed for running a saw, such as eye, ear, respiratory and hand protection ).

Edging types

Edge restraints play a major role in the overall success of an interlocking pavement installation Edging restraints remove lateral motion of the pavers and hold the pavers tightly together. Especially at the external border of the paver application, without an edging restraint, your project is ensured to stop working over time.

There are numerous various edging restraints from which contractors can pick. Generally made edge restraints are the most frequently utilized by contractors. Made edging restraints can vary from, plastic edging, steel and aluminum, timbers or precast concrete and stone. An edging type that is used mostly in industrial and commercial applications is poured-in-place concrete curbs. This edging restraint is normally installed by other contractors.

Edging installation.

This could result in the migration of the bedding sand and eventual lateral movement of the pavers. If there is a possibility of losing bedding sand in between the pavers and the edge restraint, then geo textile material is suggested. When a gap in between the pavers and the edging exceeds 3/8" (10mm), then the space ought to be filled with cut pavers.

Compaction of brick pavers.

After installation, the pavers need to be compressed. The entire location that is to be compressed must be swept clean of any foreign things and particles that can cause scratching or scuffing on the surface of the pavers.

It is very important to have a compactor that can exert in between 3000lbs. And 5000 lbs. Of centrifugal compaction force. In addition, it is essential that the first compaction occurs before any jointing sand has actually been applied to the pavers. This can cause a bridging problem and will not permit the joints to be totally filled with jointing sand if jointing sand is applied to the pavers prior to compaction takes place. This can likewise avoid the pavers from being effectively set into the bed linen sand.

When compacting the pavers, it is recommended that you make at least 2 passes in various directions throughout the pavers. This will allow the pavers to be correctly embeded in the bedding sand and will require the bedding sand up into the joints from the bottom of the pavers.

The compaction of the pavers is really crucial to the last performance of the pavers. Failure to South Florida Pavers do proper compaction can result in contortions and pavement failure in time.


Paver pallets/bundles must be put in a way not to interfere with the paver installation. One of the most extensively used methods for the installation of pavers is hand installation of each paver. The operator of the brick saw ought to always cut the pavers away from the surface of the paver field when cutting damp, due to the fact that the pavers will create a slurry that will stain the paver surface area. Edging restraints eliminate lateral motion of the pavers and hold the pavers tightly together. When a space between the pavers and the edging goes beyond 3/8" (10mm), then the area should be filled with cut pavers.